Zanetto Builders — Forever Home Builders

Cost transparency

The Cost to Build in Tasmania — 2026

Set your home's size, finish and site for an instant feasibility range — then get the exact number, within 10%, in 48 hours.

Your starting budget

A custom home this size is typically around

−15%

$1.13M

0%

$1.25M

+15%

$1.38M

Feasibility range ±15% · $5,000/m²

Indicative only — your size, finish and site against our typical 2026 rate (from $5,000/m²). The same levers our estimating team pull, at headline level; the exact design and specification move the real number. That's what the 48-hour feasibility is for.

The exact number, in 48 hours

Any project. Two days. Within 10%.

Have plans?The Perfect Estimate — our method built on $20M+ of back-costed homes, a 3D model of your house and an open tender — delivers a feasibility within 10% of your real build cost, in 48 hours.

No plans yet? We prepare a Qualifying Budget Estimate from your brief — size, site and ambitions — so you know where you stand before you spend a dollar on design.

How the numbers actually work

The summary page of a Zanetto estimate, showing our own labour and the trades split out and totalled
The summary page of a real estimate. Our own labour and the trades, split out, then totalled. Sample document, one client's details removed.

In 2026, a Zanetto custom home typically starts at around$5,000 per square metre, and most of our Forever Homes fall between $850,000 and $4 million all up — but no single rate survives contact with a real site, design and specification.

What we won't do is publish a tidy table of per-square-metre tiers, because every custom home is priced from its actual design — a tiered rate promises a precision it can't deliver. The honest version of "what will mine cost?" is the 48-hour feasibility: your plans, costed within 10% of the real number, then open-book from there.

Context: Australian custom builders typically range from about $2,500 to $5,500+ per square metre — our starting point reflects the architectural, high-performance end of that spectrum.

Building somewhere specific? Regional guides:Hobart & the South ·Launceston & the North ·the East Coast.

What open-book actually looks like

Inside a Zanetto estimate

Every builder says their pricing is transparent. These are real pages from the sample Qualifying Budget Estimate we hand to clients, so you can judge for yourself. A $2.4 million renovation and extension, priced across 83 categories, with one client's details removed.

A page from the Zanetto Qualifying Budget Estimate setting out the three pricing engines: labour, materials and subcontract trades

01

Three engines, not one guess

Most builders scale quantities off a flat drawing and fill the gaps with industry averages. We price your home three ways: our own labour, costed from more than $20 million of finished jobs; materials read straight off a 3D model of your house; and every subcontract trade quoted twice, then negotiated.

The labour and materials split from a real estimate: $656,658 of Zanetto labour across 28 categories and $1,542,160 of materials, suppliers and trades across 55

02

Where the money goes

Our own labour and the trades are split out and shown separately, category by category. Overhead, profit and contingency sit inside those categories rather than in one mystery line at the bottom.

The cost summary page of a Zanetto estimate, listing each labour category with its total excluding GST

03

Every category, priced

More than 90 cost categories run on every project we price. On this one, 83 carried scope and 13 came back with no scope. A nil is a decision we made and can explain, not an item we forgot. That is the single most common way a budget gets quietly understated.

A single estimate category broken into ten line items with quantity, unit, rate and total, coming to $110,852.76 for roofing

04

Inside a single category

The summary gives you 83 numbers. Behind each one sits this. Roofing alone runs to ten priced lines with quantities, units and rates, so you can check the working rather than take the total on trust.

The allowances page explaining Prime Cost and Provisional Sum items, with a worked example of each

05

The two words that cause the most trouble

Prime Cost and Provisional Sum are where most fixed-price contracts come unstuck. We set out exactly what each one covers, and show you a worked example of what happens when the real cost lands over or under the allowance. Where it comes in under, the saving is yours.

The assumptions page of a Zanetto estimate, listing bushfire attack level, engineering, finishes schedule, existing structure and site conditions

06

What we had to assume

No estimate is better than the information behind it. Rather than bury the gaps, we list them: every place the number could move once the missing information arrives, and every one of them answerable before you commit to a build.

The bottom line of a Zanetto estimate: sub total $2,198,818.08, GST $219,881.81, total investment $2,418,699.89
One number at the end, with every number that made it shown above.
The cover of the Zanetto Qualifying Budget Estimate sample document

No plans yet

The Qualifying Budget Estimate

A real number before you commit to anything. $750 plus GST, a one-off professional fee, typically back within five business days, then an hour with us going through it line by line. It is not a sales quote and it is not credited against the build, which is exactly why you can trust the figure in it.

Start your estimate →
The Final Build Estimate fee guide page listing the fourteen steps included in the estimate stage

Ready to build

The Final Build Estimate

The last step before you break ground. Fourteen set steps over three to five weeks, from the site visit with our trades through to contract signing, ending in a face-to-face meeting where we open the estimate across a table and you see every line of it.

How the estimate is built →

What moves the number

The four factors that shape a Tasmanian build budget

Site & Location

Slope, access, soil, bushfire (BAL) and coastal exposure ratings, and services connection all shape cost before a single frame goes up. Tasmanian sites vary enormously — from tight urban blocks in Hobart to exposed East Coast headlands.

Design Complexity

Floor area is only one input. Roof forms, glazing area, level changes, and detailing resolution move cost more than size alone — which is why cost-per-square-metre figures mislead more than they inform.

Performance Level

Energy-efficient and high-performance builds typically carry a 5–15% premium over standard construction, depending on targets and systems. A certified Passive House invests more up front and returns it in running costs — up to 80–90% less heating and cooling energy demand.

Finish & Fixtures

The band between a considered premium finish and full luxury specification is wide. Selections are where budgets most often drift — our open-book process makes every selection a visible, priced decision.

The Passive House equation

Bluebush, a certified Passive House at Blackmans Bay, at last light
Bluebush, Blackmans Bay. Independently tested at 10 kWh/m²·yr heating demand and 0.5 air changes per hour. The premium is paid once. The saving arrives every year after.

A certified Passive House asks more of the budget up front — better materials, precision detailing, tested airtightness — and pays it back every year the home is lived in. Heating and cooling energy demand can fall by up to 80–90% against a standard home, with more stable running costs and a healthier, more durable building.

Over the life of a Forever Home, the question is rarely "can we afford to build to this standard?" — it's "what does it cost us not to?"

Run your own numbers with the Passive House savings calculator, learn more about Passive House design & building, or meet our Certified Passive House team.

Frequently asked questions

Build costs in Tasmania — your questions answered

The Hide, a Forever Home at Bridport on Tasmania's northern coast, at dusk
The Hide, Bridport. Every figure below is one we will stand behind on a real site.
How much does it cost to build a custom home in Tasmania?+

A Zanetto custom home typically starts at around $5,000 per square metre in 2026, and most of our projects range between $850,000 and $4 million all up — depending on size, complexity, site conditions, finish level, and performance requirements. But a per-square-metre rate alone hides more than it reveals, which is why we cost every home from its actual design.

How much does it cost to build a house in Tasmania?+

Most custom homes in Tasmania start at around $5,000 per square metre in 2026, with the majority of our Forever Homes landing between $850,000 and $4 million all up. The exact figure depends on size, site conditions and finish level — which is why we prepare a costed feasibility within 10% of your real build cost in 48 hours, rather than quoting a single rate.

What is the cost of building a house in Tasmania?+

The cost of building a house in Tasmania depends on design, site and finish level. As a guide, our custom homes start around $5,000 per square metre in 2026 and most projects fall between $850,000 and $4 million. We price every home open-book, so you can see exactly where the money goes before you commit.

What is the cost per square metre to build a house in Tasmania?+

For an architectural custom home, expect a starting point of around $5,000 per square metre in 2026 with Zanetto Builders; Australian custom builders more broadly range from about $2,500 to $5,500+ per square metre. Treat any per-square-metre figure as a starting point only — site, design complexity, performance level and finish move the real number, which is why we prepare a costed estimate for your specific project within 48 hours.

Why don’t you quote a single price per square metre?+

Because it excludes the items that actually move budgets — site works, services, design complexity, performance targets, and finish level — and it ignores quality differences entirely. We price every home from its actual design, site and specification, and show you the full breakdown open-book.

How much more does a Passive House cost to build?+

A certified Passive House typically costs more upfront than a standard home due to higher-quality materials, detailed design, and precision construction. That investment is offset over time through dramatically lower energy costs — a well-built Passive House can reduce heating and cooling energy demand by up to 80–90% — plus improved durability and comfort.

How do I find out what my project will actually cost?+

Our in-house estimating team prepares a detailed feasibility within 10% of your real build cost, turned around in 48 hours, for any project. It’s a genuine costed assessment across every category of the build — not a per-square-metre guess.

What is open-book pricing?+

Every labour, material, subcontractor, allowance and margin cost is documented and visible to you. You see where every dollar goes, from feasibility through to handover — so there are no hidden margins and no surprises.

Does building on the East Coast or a regional site cost more?+

Often, yes. Travel, trade availability, coastal exposure ratings and services connection can add cost on regional and East Coast sites. These are exactly the line items an early feasibility surfaces — before you commit to land or design.

Accredited & proud member of

Master Builders Tasmania — MemberHousing Industry Association — MemberAustralian Passive House Association — MemberSustainable Builders Alliance — Proud MemberPassive House Institute — Certified

Let's build your Forever Home.

Book a no-obligation consultation with our team and start the journey.

Start Your Project